Power Supply project for 3 hours lift autonomy!

Power Supply project for 3 hours lift autonomy!

Posted by Liam McGregor on 2nd Feb 2022

That's a lot of batteries! Uninterruptible Power Supply (UPS) project for 3 hours lift autonomy! In December 2021, Axxa completed the installation of a Riello, 3-Phase UPS system, to provide 3 … read more
225kW Test Rig Panel Built In 4 Days? Not Bad!

225kW Test Rig Panel Built In 4 Days? Not Bad!

Posted by Liam McGregor on 2nd Dec 2021

An ABB VFD (Variable Frequency Drive) test rig went down, and a nationwide network rail manufacturer found themselves in an unfortunate position. The VFD drive panel couldn’t be repaired and m … read more
Brake motor solution for an ancient motor

Brake motor solution for an ancient motor

Posted by Liam McGregor on 23rd Oct 2020

8-Pole (~750rpm), braked motors can be quite difficult to supply quickly nowadays. Axxa overcame this by supplying a standard Leroy-Somer motor with this modular brake attachment and of course matched … read more